Project Summary

We worked with Tirlán to enhance the performance and reliability of their dairy processing facility through targeted mechanical and stainless-steel system upgrades. Our scope included equipment replacement, hygienic pipework fabrication and system optimisation to support higher throughput while maintaining strict food safety requirements.

Location

Drogheda

Industry

Dairy

Client

Tirlán

Case Study

Challenges / Client Needs:
Tirlán needed to modernise critical sections of their processing line to support growing production volumes and improve energy performance. Ageing components were limiting efficiency and the existing layout required reconfiguration to better suit current processing demands.


Our Approach / Solution:
We carried out a comprehensive review of the plant’s mechanical and utility systems to identify bottlenecks. The project included:

  • Fabrication and installation of new stainless-steel process pipework

  • Upgrades to pumps, valves, and flow-control equipment for improved system reliability

  • Hygienic redesign of key process areas to streamline cleaning procedures

  • Integration of new equipment with existing automation and safety systems

Results / Achievements:

  • Improved process consistency and throughput across key production stages

  • Reduced maintenance requirements and unplanned downtime

  • Enhanced hygiene standards and easier CIP operations

  • Expanded capacity to support future production growth